Water Sector
Introduction
Water Projects sector was established in 1995, working in water management utilizing
a unique team that compose from engineers, technicians and administrators, and covers
most areas of the water works of Saudi Arabia with a total projects number up- to 26
with different sizes ranging between the medium-sized and relatively large projects.
Sector Description
- This Sector is well equipped with state-of-the-art machinery used by skilled technicians.
- Project sites are scattered at various locations of the kingdom.
- Operation & Maintenance of water wells, Water Treatment Plants and the associated
Water transmission network elements.
- Major activities inclued survey, planning, implementation of water project activities
including the construction of water tank, water pipe lines, water treatment plants and associated distribution networks.
 
 
The scope of work for Water Projects:
Description of the most important work in water projects:
- Provide specialized technical staff for the tasks required by the projects owner
(Ministry of Water & Electricity).
- Supply and provide the necessary materials and spare parts to Cary-out
maintenance required.
- Maintenance of existing facilities within the project.
- Submit water samples for testing from all parts of the water net work.
- Maintenance of pipeline (Plastic, Polyethylene, Ductile, Stainless steel, Black
steel Pipes) and installation of all kinds of houses connections, with all accessories including flow meter of water.
- Installing the sterilization of water (by chlorine).
- Well cleaning and control of output of the well (water) from Quality and quantity point of
view.
  
 
Sector Staff
Staff volume is time variable according to the work volume, currently the staff volume is approximately 450 to 550 persons including management team includes rigger, civil, electrical, mechanical engineers, procurement and logistic teams.
List of Projects
| Operation and maintenance of drinking water |
QASSIEM |
Ministry of Water and Electricity |
42,700,000 |
Operation and maintenance of drinking wells in the northern border |
THE NORTHEN BORDER |
Ministry of Water and Electricity |
19,835,236 |
Operation and maintenance of drinking wells Baha |
ALBAHA |
Ministry of Water and Electricity |
14,780,000 |
Replacement of old water network in downtown Hail |
HAIL |
Ministry of Water and Electricity |
20,000,000 |
Operation and maintenance of oyon aljwa'a |
QASSIEM |
Ministry of Water and Electricity |
15,315,000 |
Improve water networks system |
QASSIEM |
Ministry of Water and Electricity |
28,900,000 |
The Main Clients of the Water Projects Sector are:
- Ministry of Water and Electricity

- National Water Company

|